Project Detailsx
Client: Rockingham General Hospital
Location: Rockingham
Year Completed: 2021
Category: Façade Systems
This project was in a high risk location and required the removal and replacement of approximately 3000m2 of non-compliant aluminum composite panel (ACP). The hospital remained fully functional and operational surgical theatres required methodology adaptation due to these high risk locations.
Works included: