Project Details
Client
Brookfield Properties
Location
KPMG - 235 St Georges Terrace
Year Completed
2022
Category
Waterproofing
Project Overview
At 235 ST Georges Terrace, Kilmore Group has recently completed waterproofing works to the rooftop area. This required the removal of the existing liquid waterproof system, and installation of a two-layer 1045m2 bituminous torch-on waterproof membrane.
Works Included
- full removal of existing waterproofing system
- concrete slab preparation
- Soprema two layer torch-on membrane system
- rope access works