Torch-on Waterproofing

Project Details

Client

Brookfield Properties

Location

KPMG - 235 St Georges Terrace

Year Completed

2022

Category

Waterproofing

Project Overview

At 235 ST Georges Terrace, Kilmore Group has recently completed waterproofing works to the rooftop area. This required the removal of the existing liquid waterproof system, and installation of a two-layer 1045m2 bituminous torch-on waterproof membrane.

Works Included

  • full removal of existing waterproofing system
  • concrete slab preparation
  • Soprema two layer torch-on membrane system
  • rope access works